Work has started, on the ARES Comms Trailer. Will KG7LPW is the lead construction guru. Interior walls are being taken down and insulation added. The exit ports for coax have been installed. Al AC1AC has started on installing the interior lights and the exterior lighting is done. We hope to have the trailer functional (but not done!) for the April 18 Walk MS. If you are interested in helping with the construction, you can contact the trailer crew at trailer [at] multnomahares [dot] org.